Hi everyone
I am in NSW.
I've just had a 2kw PV system installed (thank you Energy Matters - cost $4500). No complaints about the install, it was really quick, and seems like it was done well. Only problem was my little roof wasn't big enough, so the panels are split across two surfaces with different orientations (very much non-ideal, so I should have been less greedy and gone for a 1.5kw system).
But it hasn't been connected up. I have an old power board (fuses rather than circuit breaker switches) and an old-style meter (wheels).
Everyone involved in the install, and local electricians, says I MUST get the meter replaced, and they also recommend I replace the power board with a modern style one. Happy to do the latter, as replacing fuses in the dark when you live in the country and don't have the correct fuse wire can be a pain!
But as there is no feed-in tariff in NSW, I though I could just get the inverter connected to the meter, and let it run backwards when exporting power. But the electricians I have spoken to won't do it.
Any ideas or advice?
Pete